ISRO’s PSLV-C16 Places 1,206-Kg ResourceSat-2 and Two Co-Passenger Satellites Into Precision Polar Orbit

Equipped with three multi-spectral cameras spanning 5.8-metre to 56-metre resolution plus AIS maritime tracking, ResourceSat-2 sharpened national crop-yield, glacier, and groundwater mapping.

AI Voice Narration~4 min audio
📅 Historical Milestone Archive Coverage (2011): Preserved in the CNN-News18 Multi-Year Milestone Archive with verified primary institutional filings, statutory citations, and original reporting benchmarks.
ISRO’s PSLV-C16 Places 1,206-Kg ResourceSat-2 and Two Co-Passenger Satellites Into Precision Polar Orbit — Earth Observation | CNN-News18
ISRO’s PSLV-C16 Places 1,206-Kg ResourceSat-2 and Two Co-Passenger Satellites Into Precision Polar Orbit • Beat: Earth Observation • 2011 • CNN-News18 Newsroom Photo
In Brief: Key Verified Takeaways
  • Lifting off at 10:12 IST on April 20, 2011 from Sriharikota’s First Launch Pad, PSLV-C16 recorded the Polar Satellite Launch Vehicle’s 17th consecutive successful mission.
  • Flying in standard configuration with six solid strap-ons, it injected 1,206-kg ResourceSat-2, 92-kg Indo-Russian stellar/atmospheric YouthSat, and Nanyang Technological University’s 106-kg X-SAT into an 822-km polar Sun-Synchronous Orbit.
  • ResourceSat-2 upgraded LISS-4 multispectral swath width more than threefold from 23 km to 70 km at 5.8-metre spatial resolution alongside 12-bit radiometric quantization on AWiFS.
  • An additional Canadian-built Automatic Identification System (AIS) payload tracked VHF transponders from merchant vessels across Indian Ocean sea lanes.

Extending its workhorse launcher’s unbroken reliability streak to seventeen consecutive flights, the Indian Space Research Organisation’s PSLV-C16 lifted off cleanly from Satish Dhawan Space Centre in Sriharikota at 10:12 IST on April 20, 2011 and placed three spacecraft—led by India’s 1,206-kilogram ResourceSat-2 Earth-observation observatory—into an 822-kilometre polar Sun-Synchronous Orbit eighteen minutes later.

Ensuring seamless data continuity for global users of 2003’s ResourceSat-1 (IRS-P6), ResourceSat-2 carried an upgraded three-tier camera suite: the Wide Field Sensor (AWiFS) scanning 740-kilometre swaths every five days for national crop health, LISS-3 at 23.5-metre resolution, and an enhanced LISS-4 camera widening 5.8-metre multispectral swaths from 23 km to 70 km.

Academic Co-Passengers and Maritime AIS Surveillance

Riding alongside the main payload were the 92-kilogram Indo-Russian student science satellite YouthSat and Singapore’s maiden indigenous micro-satellite, Nanyang Technological University’s 106-kilogram X-SAT, while an experimental Automatic Identification System receiver aboard ResourceSat-2 relayed ship-tracking telemetry studied across Tech+ space dispatches.

DataPulse Fact Sheet: Earth Observation — Verified Parameters & Institutional Benchmarks
Assessment DimensionVerified Filing / Operational Benchmark
Core Coverage DomainTech+, AI & Semiconductors — Earth Observation
Headline Quantitative Anchor23 km (Lifting off at 10:12 IST on April 20, 2011 from Sriharikota’s First Launch Pad, PSLV-C16 recorded the Polar Satellite Launch Vehicle’s 17th consecutive successful mission.)
Primary Institutional AuthorityIndian Space Research Organisation (ISRO)
Operational MechanismFlying in standard configuration with six solid strap-ons, it injected 1,206-kg ResourceSat-2, 92-kg Indo-Russian stellar/atmospheric YouthSat, and Nanyang Technological University’s 106-kg X-SAT into an 822-km polar Sun-Synchronous Orbit.
Safeguards & Downstream ImpactResourceSat-2 upgraded LISS-4 multispectral swath width more than threefold from 23 km to 70 km at 5.8-metre spatial resolution alongside 12-bit radiometric quantization on AWiFS.

Systems Engineering Architecture, Sovereign Compute Stack and Standards

From a deep-tech systems perspective, engineering leads following Tech+, AI & Semiconductors note that Earth Observation addresses the hardest bottleneck in modern technology sovereignty: moving from laboratory prototypes to repeatable, production-grade deployment at scale. Validated through Indian Space Research Organisation (ISRO) around the 23 km performance benchmark, the architecture prioritizes interoperability, deterministic latency, hardware-level security, and domestic supply-chain resilience.

Across India’s expanding semiconductor, space, quantum, and sovereign-cloud corridors—covered extensively in Explainers & DataPulse—lowering unit compute and fabrication friction creates immediate spillover gains for startups, academic labs, and regulated BFSI or defence workloads. Specifically, the engineering requirement that ResourceSat-2 upgraded LISS-4 multispectral swath width more than threefold from 23 km to 70 km at 5.8-metre spatial resolution alongside 12-bit radiometric quantization on AWiFS. ensures domestic deployments meet stringent international reliability and cryptographic assurance standards.

DataPulse Visual Briefing: ISRO’s PSLV-C16 Places 1,206-Kg ResourceSat-2 and Two Co-Passenger Satellites Into Precision Polar Orbit — Earth Observation | CNN-News18
CNN-News18 DataPulse Infographic: Executive breakdown of verified parameters for Earth Observation.

Ecosystem Commercialization, Talent Pipelines and Global Competitiveness

Equally vital is the commercialization pathway connecting public R&D milestones with private industrial adoption: An additional Canadian-built Automatic Identification System (AIS) payload tracked VHF transponders from merchant vessels across Indian Ocean sea lanes. Enterprise CIOs and venture researchers point out that predictable domestic APIs, testing testbeds, and packaging fabs dramatically shorten hardware-to-software iteration loops that previously depended on offshore vendors.

As next-phase qualification trials progress, technology analysts monitoring Current Affairs will watch developer adoption metrics, fab and cluster utilization rates, power-efficiency benchmarks, and export qualification contracts across global enterprise markets.

Key Implementation Checklist, Stakeholder Impact and Verification Trail

Synthesizing the primary documentary record filed under Indian Space Research Organisation (ISRO) — PSLV-C16 / ResourceSat-2 Mission Official Post-Launch Release, Sriharikota (April 20, 2011), institutional reviewers identify three interconnected execution pillars that separate durable reform from short-term announcements around Earth Observation. First, anchoring capital, operational, or curatorial allocations around 23 km establishes an auditable baseline—specifically reinforcing the core mandate that Lifting off at 10:12 IST on April 20, 2011 from Sriharikota’s First Launch Pad, PSLV-C16 recorded the Polar Satellite Launch Vehicle’s 17th consecutive successful mission. Second, technical protocols governing day-to-day rollout require participating agencies and operators to verify that Flying in standard configuration with six solid strap-ons, it injected 1,206-kg ResourceSat-2, 92-kg Indo-Russian stellar/atmospheric YouthSat, and Nanyang Technological University’s 106-kg X-SAT into an 822-km polar Sun-Synchronous Orbit.

For citizens, enterprise decision-makers, and policy researchers consulting CNN-News18’s Newsroom Topics Directory and Multi-Year Archive, tracking how central notifications interface with state-level or last-mile execution remains essential. Historical precedent across Indian infrastructure, regulatory, judicial, scientific, and market cycles shows that early transparency in procurement, telemetry reporting, and public grievance redressal substantially accelerates adoption while compressing implementation risk across subsequent fiscal quarters.

Filed Under: Earth Observation Tech+, AI & Semiconductors 2011 Coverage Today’s News
Direct Newsroom Dispatch

The CNN-News18 Morning Briefing

Receive verified national and geopolitical reporting, policy breakdowns, and the daily market wrap directly in your inbox every morning at 7:00 AM IST.

Verified Institutional Sources & Public Records

This dispatch has been verified against official government gazettes, regulatory filings, and institutional briefings under the CNN-News18 Fact-Checking Protocol and Editorial Code.

  • Indian Space Research Organisation (ISRO) — PSLV-C16 / ResourceSat-2 Mission Official Post-Launch Release, Sriharikota (April 20, 2011)
  • National Remote Sensing Centre (NRSC), Hyderabad — ResourceSat-2 LISS-IV, LISS-III & AWiFS Payload Technical Specifications
C

CNN-News18 Science Archive Desk

✓ Verified Editorial Desk

Specialist editorial desk at CNN-News18 compiling verified primary-source dispatches, statutory filings, and archival milestone journalism.

Explained: Key Questions & Context

How did ResourceSat-2 improve agricultural and water monitoring over ResourceSat-1 (2003)?

Tripling the high-resolution LISS-4 multispectral imaging swath from 23.9 km to 70 km and upgrading radiometric sensitivity from 7/10-bit to 10/12-bit enabled far faster district-level crop acreage forecasts, snow-melt runoff models, and urban land-use audits.

What was the scientific mission of the co-passenger YouthSat spacecraft?

Jointly built by ISRO and Moscow State University for student researchers, the 92-kg YouthSat carried three payloads studying solar flare X-rays, upper-atmospheric airglow, and ionospheric tomography.

Which official institutions and primary records verify Earth Observation?

Primary verification for this report is anchored by Indian Space Research Organisation (ISRO) — PSLV-C16 / ResourceSat-2 Mission Official Post-Launch Release, Sriharikota (April 20, 2011), alongside cross-checked disclosures from National Remote Sensing Centre (NRSC), Hyderabad — ResourceSat-2 LISS-IV, LISS-III & AWiFS Payload Technical Specifications.

What is the key benchmark figure and next implementation milestone for Earth Observation?

The central benchmark tracked in official filings is 23 km. Downstream monitoring focuses on an additional Canadian-built Automatic Identification System (AIS) payload tracked VHF transponders from merchant vessels across Indian Ocean sea lanes.

← Previous Dispatch

Explained: How NPCIL and AERB Stress-Tested India’s 20 Operating Nuclear Reactors After Fukushima

Next Dispatch →

MS Dhoni’s Iconic Six Seals Six-Wicket Wankhede Chase as India Lift 2011 ICC Cricket World Cup After 28 Years

Related Stories in Tech+